Akbuk — roof renovation (day one)
GoPro footage from the first day of a roof renovation in Akbuk, Didim.
Short site films from Akbuk, Altinkum and Hisar.
GoPro footage from the first day of a roof renovation in Akbuk, Didim.
Ready-mix concrete pour for a garden balcony extension.
Finished roof-raising job in Hisar, Didim.
Steel roof, Boardex render and terrace enclosure.
Top section sheet covering on the Akbuk roof.
Fourth progress clip from the Akbuk roof renovation.
Solar install, tile prep and an insulated steel roof.
Timber door and automatic-shutter window fitting.
Ceramic tiling on the newly poured concrete area.
Ceramic tiling at Cornelia, Liman Yolu, Didim.
Starting ceramic tiling on another renovation.
Automatic shutter, PVC frame and insect-screen install.
First day of a villa renovation in Akbuk.
Third progress clip from the Akbuk roof renovation.
Second progress clip from the Akbuk roof renovation.
Progress on the Akbuk roof renovation.
Day one: taking off the old roof in Akbuk.
Starting a roof and room raise in Akbuk.
Gutters and sheet covering after the AC lines were run through the roof.
Prep before the C35 ready-mix pour in Hisar, Didim.
On-site clip from mineral render day on the facade.
The completed anthracite and white steel roof.
A completed steel roof with Boardex and mineral render.
Scaffolding tied off for the extended room facade.
Automatic shutter and glazed steel door install with Uğur Usta.
Garden fencing and gate installation with craftsman Uğur Karadoğan.
A clean, completed steel roof at Akkent, Akbuk.
Channel sliding insect-screen installation in Altinkum.
Final stage of an aluminium sliding door and screen install.
Aluminium sliding door and glass balcony installation.
Ali Candan talks through a solar and water installation on site.
Roof raising in progress in Hisar, Didim.
Progress on a room extension in Hisar, Didim.
When the job needs more than asked, we step in and finish it.